Excavate for the area where the blocks will be installed
|
Run a string line to help define line and grade
|
Place the blocks in the "footing". Space the
blocks about 9 inches apart on a level surface
|
Place the blocks in the "footing". Space the
blocks about 9 inches apart on a level surface
|