Installing a "back-drain using pipe and filter fabric
|
Blading the compacted soil surface preparing for a layer
of geogrid
|
Spreading soil preparing for it to be compacted
|
Spreading newly delivered soil to the wall area
|
|
|
|
|
Geogrid placed around vertical obstructions
|
Footing trench being "proof
rolled" or compacted
|
Compacting soil with a vibratory sheepsfoot
|
Compacting soil with a vibratory sheepsfoot
|
|
|
|
|
Transferring soil for block fill using a front end loader
to fill the soil distribution hopper
|
Compacting a slope above a completed wall
|
A nearly completed wall behind a shopping center site
|
Excavating for the "footing"
|
|
|
|
|
Excavating for the "footing"
|
Footing excavation
|
Footing layout
|
placing the block in the footing excavation.
Note the spaces between the blocks
|
|
|
|
|
The grapple is preparing to grab 4 blocks and place them on the wall.
|
The grapple picks up 4 blocks off the pallet
|
The grapple is grabbing 4 blocks to be placed on the wall
|
The grapple is placing 4 blocks onto the wall
|
|
|
|
|
A front end loader is placing soil onto the grid in areas where obstacles
exist.
|
Geogrid has been laid out and another row of blocks are placed on
top
|
Master geogrid roll is rolled out in preparation for cutting into
finished pieces
|
A leveling pad of soil is placed along the wall alignment in preparation
for block placement
|
|
|
|
|
The newly placed blocks are being aligned by
the laborers
|
Construction equipment is moving around the job
site
|
The wall is going up, up, up
|
Laborers are rod-boarding to smooth the block fill in preparation
of placement of the next row of Verdura blocks
|
|
|
|
|
A scraper is delivering soil to the wall area. The laborer is "cleaning
up" in preparation of the next row of blocks being placed.
|
A scraper is delivering soil to the wall area. Note how close the
scraper is to the wall face
|
Scrapers delivering soil to the wall
|
The side-dump is filling the blocks with soil
|
|
|
|
|
The side-dump is filling the blocks with soil
|
Posi-Dura is placed in the blocks
|
Posi-Dura tails and Verdura blocks ready to be
filled with soil
|
Verdura Block place on the geogrid ready to be
filled with soil
|
|
|
|
|
Compacting the soil immediately behind the wall face
|
Moisture conditioning the soil |
Moisture conditioning the soil
|
|